Skip to content
Product Range

Generator Synchronising Panels in Kenya

Panels that parallel two or more generator sets with automatic synchronising and load sharing, for large standby loads in Kenyan factories and data centres.

A generator synchronising panel is switchgear that brings two or more generator sets into step on voltage, frequency and phase angle, closes each onto a common busbar and then shares the load between them. Low-voltage versions are assemblies under IEC 61439-1/-2. In Kenya they serve factories, data centres and hospitals whose standby load outgrows one generator.

Panel Tech Systems lists synchronising generator panels, for multi-genset paralleling with automatic load sharing, among the systems it delivers for data centres and for manufacturing plants where the grid feed is unreliable. A synchronising panel has to be matched to the particular generator sets, site load and transfer scheme, so a quote starts from your single-line diagram and generator data. The panel usually works alongside the mains changeover from our ATS and MTS systems service and a main switchboard such as our LV Panel.

Standby generator arrangements compared: when a synchronising panel is needed

Arrangement How it works Redundancy Typical fit
Single genset + ATS ATS moves load from mains to one generator None: one set failing means no backup Small to medium sites, simple loads
Several gensets, separate ATSs Each set feeds its own loads; no paralleling Partial: each load group has one source Load groups that can stay split
Island parallel (sync panel + ATS) Sets synchronise onto a common bus, share load N+1 possible if one set is spare Large or growing standby loads, critical sites
Island parallel + closed-transition return Generator bus briefly parallels mains on retransfer As island parallel; no break returning to mains Sites avoiding a second outage on return
Continuous mains parallel Sets run with the grid for base or peak load Depends on design; grid stays connected Base-load or peak-lopping; needs Kenya Power approval

How to Choose: Generator Synchronising Panels

1. Confirm that you need paralleling at all

If one generator can carry the whole standby load and a short break on failure is acceptable, a single set with an ATS / MTS Kenya panel is simpler. A synchronising panel makes sense when the load is larger than one practical set, when you want N+1 redundancy, when load will grow in stages, or when sets must stay well loaded while demand swings. Our guide ATS vs MTS vs STS covers the transfer side of that decision.

2. Define the operating mode

Decide whether the generators will only ever run in parallel with each other (island mode, with the mains kept separate by an ATS or interlocked incomers), briefly parallel with the mains for a no-break return, or run continuously alongside the grid. Any paralleling with the Kenya Power network needs the utility's approval and additional interface protection, so settle this before the design is fixed.

3. Check generator compatibility

  • Governors and AVRs must accept speed and voltage adjustment from the synchronising controller.
  • Sets of different sizes can share load in proportion to rating, but their rating class (prime or standby, as defined in ISO 8528-1) should suit the duty.
  • Where alternator neutrals are connected together, the neutral earthing arrangement must be engineered to limit circulating currents.

For total capacity, see how to size a standby generator.

4. Choose the load-sharing and power-management functions

Specify active-power (kW) sharing through the governors and reactive-power (kVAr) sharing through the AVRs. Then decide on load-demand start and stop of sets, duty rotation to even out running hours, and priority load shedding so that critical circuits stay on if a set trips.

5. Size the breakers and common busbar

Each generator needs a motorised breaker that closes only on a sync-check permissive, or onto a dead bus for the first set. The common busbar must carry the combined output, and its short-circuit rating must cover the prospective fault level, which rises with every set connected. Check discrimination with downstream feeders (see breaker discrimination) and specify the form of internal separation as you would for any LV Panel.

6. Specify protection and monitoring

Typical protection for each generator includes sync-check (ANSI 25), reverse power (32), under/overvoltage (27/59), under/overfrequency (81) and overcurrent (50/51), plus earth-fault protection suited to the earthing system and an emergency stop. Your consultant may add others. For data centres and hospitals, add remote monitoring and alarms to the BMS over an agreed protocol such as Modbus.

7. Plan testing

Ask for a factory test of the synchronising and load-sharing sequence, then commissioning on site with the actual generators under load bank or live load.

Send us your single-line diagram, generator details and preferred operating mode through our contact form, or call 0799 531765, for a synchronising panel quote.

Technical Guides

Genset Synchronising Panel Kenya: 2026 Guide & Specs

A genset synchronising panel Kenya system allows multiple generators to run in parallel using automatic synchronisation, load sharing, and protection. Paneltech Systems provides reliable generator control solutions for industries, commercial facilities, and critical power applications across Kenya.

Read guide

Generator Integration in Kenya | Power Systems Guide

Generator integration with electrical panels in Kenya ensures reliable backup power during outages by automatically switching between grid and generator supply. It improves safety, reduces downtime, and supports continuous operations in industries, commercial buildings, and critical facilities.

Read guide

Generator Sizing Kenya: How to Size a Standby Generator for a Commercial Building

Generator sizing Kenya projects requires more than adding the wattage of every electrical appliance. A suitable standby generator is selected by assessing connected and essential loads, demand, power factor, motor-starting requirements

Read guide

ATS vs MTS vs STS: Choosing the Right Transfer Switch for Your Facility

A practical comparison of Automatic Transfer Switches, Manual Transfer Switches, and Static Transfer Switches. Transfer time, application fit, sizing rules, and what each one really does.

Read guide

Breaker Discrimination Kenya: Why One Faulty Circuit Should Never Trip the Main

Breaker discrimination Kenya ensures faults stay local by coordinating circuit breakers for safe, reliable power distribution. Discover how selectivity, trip curves, MCCB and ACB coordination improve uptime in industrial and commercial electrical systems.

Read guide

Hospital Power Backup Solutions Kenya: 2026 Engineering Guide and Specs | Paneltech Systems Kenya

Looking for hospital power backup solutions in Kenya? Hospitals require mission-critical power reliability. Learn how ATS systems and LV panels ensure uninterrupted ICU and theatre operations. Paneltech Systems Ltd provides IEC-certified electrical solutions in Nairobi.

Read guide

Frequently Asked Questions: Generator Synchronising Panels

It lets two or more generator sets run as one power source. The first set ready closes onto the dead busbar; for each following set, the controller adjusts engine speed and alternator voltage until frequency, voltage and phase angle match the live busbar, then closes that generator's breaker. Once connected, it shares kW and kVAr between the sets in proportion to their ratings and protects them against faults such as reverse power. Most panels also start and stop sets to match demand and shed non-essential load if a set trips.
It depends on the load and how critical it is. One large set with an ATS is simpler and has fewer components. Two or more synchronised sets give redundancy (the site keeps partial or full power if one set fails), let you add capacity in stages, and allow sets to be switched off at light load so the running engines stay well loaded. The trade-off is a more complex control panel and generators that must have compatible governors and AVRs.
Usually, yes. Mixed sizes share load in proportion to their ratings, and different brands can be paralleled provided each set's governor and AVR can be controlled by the synchronising controller. Points to check include engine response to load steps, alternator winding pitch and the neutral earthing arrangement, because poorly matched alternators with neutrals connected can circulate current between them. A site survey of the existing sets is the safest way to confirm compatibility.
Technically it can, either briefly for a no-break return to mains or continuously for base-load or peak-lopping duty. However, paralleling with the Kenya Power network should not be done without the utility's approval, and it needs additional interface protection to disconnect the generators if the grid fails. Most standby schemes in Kenya avoid this by running the generators in island mode, with an ATS or interlocked incomers keeping the mains and the generator bus apart.
In most standby schemes, yes. The synchronising panel joins the generators onto a common bus, while a transfer switch, or interlocked mains and generator-bus incomers, moves the site load between Kenya Power and that bus. The two functions can be built into one switchboard or supplied as separate panels. See our ATS / MTS Kenya range and ATS and MTS systems service for the changeover side.
Each generator breaker should have sync-check (ANSI 25) so it cannot close out of phase, reverse power (32) to stop a failing set being motored by the others, under/overvoltage (27/59), under/overfrequency (81) and overcurrent (50/51), plus earth-fault protection suited to the earthing system and an emergency stop. Your consultant may specify further functions. The common busbar and breakers must also be rated for the combined fault level of all sets connected.
A low-voltage synchronising panel is a switchgear assembly, so IEC 61439-1 and IEC 61439-2 cover its design verification, including temperature rise and short-circuit withstand, and its forms of internal separation. Circuit-breakers inside it fall under IEC 60947-2, and IEC 60529 defines the enclosure's IP rating. The generator sets themselves are rated and specified under the ISO 8528 series. Your consultant's specification may add site-specific requirements on top of these.
Send the number of generators with their kVA ratings, make and controller type, the governor and AVR type if known, your single-line diagram, the site load profile, and the operating mode you want (island only, closed-transition return or continuous mains parallel). Add the prospective fault level, any BMS or SCADA connection needed and the installation space. You can send these through our contact form or call 0799 531765.

Need Generator Synchronising Panels for your project?

Talk to our engineers about specification, availability and delivery across Kenya.